E 6th ST Green Infrastructure Corridor

Image
Aerial image of 6th Street showing where the corridor improvement construction will begin
Project status
Complete
Location

6th St. & Soto St. Los Angeles, CA 90023 United States

Council district
Council District 14

Project Location

The Project is located within the Upper Los Angeles River Watershed in Council District 14.

Project Description

The Project includes 2700 square-feet of bioswale strips, 8 street trees, 8 catch basins, replace existing concrete swale at pedestrian staircase, drywell systems designed to capture and infiltrate stormwater runoff while enhancing the surrounding community.

Project Benefits

  • Increase stormwater infiltration and runoff capture.
  • Improve community beautification.
  • Enhance green infrastructure within the corridor.
  • Improve local water quality.
  • Provide urban greening benefits.

Project Funding

The Project cost estimate is $3,500,500 and is funded through the Safe Clean Water Municipal Program.

If you’d like to receive additional information about the E 6th St Green Infrastructure Corridor, please contact san.safecleanwater@lacity.org and place E 6th St Green Infrastructure Corridor in the subject line.

To learn more about the projects funded by the Los Angeles County Safe Clean Water Program, please visit LA County’s Safe Clean Water Program’s project map